List of publications
|
My research activity mainly focuses on combinatorial models and
algorithms for planning and scheduling problems. E-mail me to receive any of
these publications.
Journal papers |
[1] Agnetis, A., Lucertini M., Nicolò, F., 1990,
Modelling and Optimization of a Flexible Pipeline Assembly System, Ricerca
Operativa, 54, 3--31.
[2] Agnetis, A., Arbib C., Lucertini M., Nicolò, F.,
1990, Part routing in Flexible Assembly Systems, IEEE Transactions on
Robotics and Automation, 6 (6), 697--705.
[3] Agnetis, A., Lucertini M., Nicolò, F., 1993, Flow
Management in Flexible Manufacturing Cells with Pipeline Operations, Management
Science, 39 (3), 294--306.
[4] Sodhi, M.S., Agnetis A., Askin R., 1994, Tool
Addition Strategies in Flexible Manufacturing Systems, International
Journal of Flexible Manufacturing Systems, 6, 287--310.
[5] Agnetis, A., Arbib C., Lucertini M., Nicolò, F.,
1995, Task Assignment and Sub-assembly Scheduling in Pipeline Assembly
Systems, IEEE Transactions on Robotics and Automation, 1995, 11
(1), 1--20.
[6] Rebello, R., Agnetis A., Mirchandani P., 1995,
Specialized Inspection Problems in Serial Production Systems, European
Journal of Operational Research, 80 (2), 277--296.
[7] Agnetis, A., Ciancimino, A., Lucertini, M.,
Pizzichella, M., 1995, Balancing Flexible Lines for Car Components
Assembly, International Journal of Production Research, 33
(2), 333--350.
[8] Mirchandani, P. B., Rebello, R., Agnetis, A.,
1995, The Inspection Station Location Problem in Hazardous Material
Transportation: Some Heuristics and Bounds, INFOR, 33 (2),
100--113.
[9] Agnetis, A., Oriolo, G., 1995, The Machine
Duplication Problem in a Job Shop with Two Jobs, International
Transactions on Operational Research, 2 (1), 45--60.
[10] Agnetis, A., Dror, M., Vakharia, A., Rossi, F.,
1996, Tool handling and scheduling in a two-machine flexible manufacturing
cell, IIE Transactions, 28, 425--437.
[11] Agnetis A., 1996, Planning the Routing Mix in
FASs to Minimize Total TransportationTime, International Journal
of Flexible Manufacturing Systems, 8 (2), 131--157 .
[12] Agnetis, A., Pacciarelli, D., Rossi, F., 1996,
Lot Scheduling in a Two Machine Cell with Swapping Devices. IIE Transactions
28, 911-917.
[13] Agnetis, A., 1997, No-wait Flow Shop
Scheduling with Large Lot Sizes, Annals of Operations Research, 70,
415--438.
[14] Agnetis, A., Arbib, C., 1997, Concurrent
Operations Assignment and Sequencing for Particular Assembly Problems in Flow
Lines, Annals of Operations Research, 69, 1--31.
[15] Agnetis, A., Alfieri, A., Brandimarte, P.,
Prinsecchi, P., 1997, Joint job/tool scheduling in a flexible manufacturing
cell with no on--board tool magazine, Computer Integrated Manufacturing
Systems, 10, 61--68.
[16] Agnetis, A., Macchiaroli, R., Pacciarelli, D.,
Rossi, F., 1997, Assigning Jobs to Time Frames on a Single Machine to Minimize
total tardiness. IIE Transactions 29, 11, 965-976.
[17] Agnetis, A., Pacciarelli, D., Rossi, F., 1997,
Batch Scheduling in a Two Machine Flow Shop with Limited Buffer. Discrete
Applied Mathematics 72 (3), 243-260.
[18] Agnetis, A., A. Pacifici, A., Rossi, F.,
Lucertini, M., Nicoletti, S., Nicolò, F., Oriolo, G., Pacciarelli, D., Pesaro,
E., 1997, Scheduling of Flexible Flow Lines in an Automobile Assembly Plant. European
Journal of Operational Research 97 (2), 348-362.
[19] Agnetis, A., Macchiaroli, R., 1998, Modelling and
Optimization of the Assembly Process in a Flexible Cell for Aircraft Panel
Manufacturing, International Journal of Production Research, 36 (3),
815--830.
[20] Agnetis, A., Rossi, F., Gristina, G., 1998, Exact
algorithms for the batch sequencing problem in a two--machine flow shop with
limited buffer, Naval Research Logistics, 45, 141--164.
[21] Agnetis, A., 2000, Scheduling no-wait robotic
cells with two and three machines, European Journal of Operational research,
123 (2), 303--314.
[22] Adacher, L., Agnetis, A., Meloni, C., 2000, A
Simulation Study of Autonomous Agents in FMSs, IIE Transactions, 32
(10), 941--951.
[23] Agnetis, A., Smriglio, S., 2000, Optimal
Assignment of High Multiplicity Flight Plans to Dispatchers, Naval Research
Logistics, 47 (5), 359--376.
[24] Agnetis, A., Mirchandani, P.B., Pacciarelli, D.,
Pacifici, A., 2000, Nondominated schedules for a job-shop with two competing
users, Computational and Mathematical Organization Theory, 6 (2),
191--217.
[25] Agnetis, A., Pacciarelli, D., 2000, Part
Sequencing in Three Machine No-Wait Robotic Cells, Operations Research
Letters, 27, 185--192.
[26] Agnetis, A., Detti, P., Meloni, C., Pacciarelli,
D., 2001, A linear algorithm for the edge hamiltonian completion number of a
tree, Information Processing Letters, 79 (1), 17--24.
[27] Agnetis, A., Mirchandani, P.B., Pacciarelli, D.,
Pacifici, A., 2001, Job Shop Scheduling with Two Jobs and Nonregular Objective
Functions, INFOR, 39(3), 227-244.
[28] Agnetis, A., Detti, P., Meloni, C., Pacciarelli, D., Set-up coordination
between two stages of a supply chain, Annals of Operations Research,
2001, 107, 15-32.
[29] Agnetis, A., Mirchandani, P.B., Pacifici, A., Partitioning of biweighted
trees, Naval Research Logistics, 2002, 49 (2), 143--158.
[30] Agnetis, A., Alfieri, A., Nicosia, G., Part batching and scheduling in a
flexible cell to minimize setup costs, Journal of Scheduling, 2003, 6(1),
83--104.
[31] Agnetis, A., Detti, P., Meloni, C., Process
selection and sequencing in a two-agents production system, 4OR, 2003, 1(2),
103--119.
[32] Agnetis, A., Brogi, G., Ciaschetti, G., Detti, P.,
Giambene, G., Optimal Packet Scheduling in UTRA-TDD, IEEE Communication
Letters, 2003, 7(3), 112--114.
[33] Agnetis, A., Mirchandani, P.B., Pacciarelli, D.,
Pacifici, A., Scheduling Problems with Two Competing Agents, Operations
Research, 2004, 52(2), 229--242.
[34]
Agnetis, A., Modelli di Scheduling Multi-Agente, in
A. Agnetis, G.Di Pillo (eds.), Modelli e Algoritmi per l'Ottimizzazione di
Sistemi Complessi - Atti della Scuola CIRO 2002, Pitagora Editrice, 2004,
1--30.
[35] Agnetis, A., Rossi, F.,
Smriglio, S., An implicit enumeration scheme for the batch selection problem, Networks,
2004, 44(2), 151--159.
[36] Agnetis,
A., Alfieri, A., Nicosia, G., A heuristic approach to batching and scheduling a
single machine to minimize setup costs, Computers and Industrial Engineering,
2004, 46, 793--802.
[37] Filippi, C., Agnetis, A., An asymptotically exact
algorithm for the high-multiplicity bin packing problem, Mathematical
Programming, 2005, 104(1), 21--37.
[38] Detti, P., Agnetis, A., Ciaschetti, G.,
Polynomial Algorithms for a Two-Class Multiprocessor Scheduling Problem in
Mobile Telecommunications Systems, Journal of Scheduling, 2005, 8(3),
255--273.
[39] Agnetis, A., Hall, N.G., Pacciarelli, D., Supply
chain scheduling: sequence coordination, Discrete Applied Mathematics, 2006,
154, 2044--2063.
[40] Agnetis, A., D. Pacciarelli, A. Pacifici, A.,
Multi-agent single machine scheduling, Annals
of Operations Research, 2007, 150, 3--15.
[41] Agnetis, A., Grande, E., Mirchandani, P.B.,
Pacifici, A., Covering a line segment with variable radius discs, Computers and Operations Research, 2009,
36(5), 1423--1436.
[42] Agnetis, A., Alfieri, A., Nicosia, G., Single machine scheduling problems with generalized
preemption, INFORMS Journal on Computing,
2009, 21(1), 1--12.
[43] Agnetis, A., Detti, P., Pranzo, M., Sodhi, M.S.,
Sequencing Unreliable Jobs on Parallel Machines, Journal of Scheduling, 2009, 12, 45--54.
[44] Agnetis, A., De Pascale, G., Pranzo, M.,
Computing the Nash Solution for Scheduling Bargaining Problems, International Journal of
Operational
Research, 2009, 6(1), 54--69.
[45] A. Agnetis, G. de Pascale, D. Pacciarelli, A
Lagrangian approach to single-machine scheduling problems with two competing
agents,
Journal of
Scheduling, 2009, 12, 401--415.
[46] Detti, P., Hurkens, C., Agnetis, A., Ciaschetti,
G., Optimal Packet-to-Slot Assignment in Mobile Telecommunications, Operations Research Letters, 2009, 37,
261--264.
[47] Agnetis, A., Flamini, M., Nicosia, G., Pacifici,
A., Scheduling three chains on two parallel machines, European Journal on Operational Research, 2010, 202(3), 669--674.
[48] Agnetis, A., Alfieri, A., Nicosia, G., Assessing the quality of heuristic solutions
to parallel machines min-max scheduling problems, International Journal on Production Economics, 2009, 122, 755-762.
[49] Agnetis, A., Messina, E., Pranzo, M., Call
planning in European pharmaceutical sales force management, IMA Journal of Management Mathematics,
2010, 21(3), 267—280.
[50] Agnetis, A., Flamini, M., Nicosia, G., Pacifici,
A., A job-shop problem with one additional resource type, Journal of Scheduling, 2011, 14, 225--237.
[51] Agnetis, A., E. Grande, A. Pacifici, Demand
allocation with latency cost functions, Mathematical
Programming, 2012, 132, 277--294.
[52] Agnetis, A., Fragnelli, V., Some non standard features of bargaining problems, to appear on International
Game Theory Review.
[53] Agnetis, A., Kellerer, H.,
Nicosia, G., Pacifici, A., Parallel dedicated
machines scheduling with chain precedence constraints, European
Journal of Operational Research, 2012,
221, 296–305.
[54] Agnetis, A., Detti, P., Pranzo, M., The list scheduling algorithm for scheduling
unreliable jobs on two parallel machines, to appear on Discrete
Applied Mathematics.
[55] Agnetis, A., Coppi, A., Dellino, G., Meloni, C., Pranzo, M., Long term evaluation of operating theater
planning policies, Operations Research in Health Care, 2012, 1, 95–104.
[56] A. Agnetis, P. Detti, G. de Pascale,
A. Vicino, Load Scheduling for Energy Consumption
Optimization, IEEE Transactions on Smart Grid, 2013, 4(4), 2364--2373.
[57] Agnetis, A., Coppi, A., Corsini, M., Dellino, G., Meloni, C., Pranzo, M., A
Decomposition Approach for the Combined Master Surgical Schedule and Surgical
Case Assignment Problems, Health Care
Management Science, 2014, 17, 49--59.
[58] Agnetis, A., Detti, P., De Pascale, G., Raffaelli, J., Chelli, P., Colombai, R., Marconcini, G., Porfido, E., Coppi, A., Applicazione di
tecniche di operations management per minimizzare il
costo di trasporto di pazienti, Mecosan, 2012, 21(84), 51--62.
[59] A. Agnetis, G. Murgia, S. Sbrilli, A job shop scheduling problem with human operators
in handicraft production, International
Journal of Production Research, 2014, 52(13), 3820--3831.
[60] A. Agnetis, M.A. Aloulou, L. Fu,
Coordination of production and interstage batch
delivery with outsourced distribution, European
Journal of Operational Research, 2014, 238, 130—142.
[61] A. Agnetis, A. Coppi, M. Corsini, G. Dellino, C. Meloni,
M. Pranzo, Operations management e sanità: un sistema di supporto alle
decisioni per la programmazione della chirurgia elettiva, Mecosan, 2014, 90, 55-69.
[62] A. Agnetis, C. Briand, J.-C. Billaut,
P. Šucha, Nash equilibria for the multi-agent project scheduling problem
with controllable processing times, Journal
of Scheduling, 2015, 18(1), 15--27.
[63] A. Agnetis, M.A. Aloulou, L. Fu, M. Kovalyov, Two faster algorithms for coordination of
production and batch delivery: a note, European
Journal of Operational Research, 2015, 241, 927--930.
[64] A. Agnetis, G. Nicosia, A. Pacifici,
U. Pferschy, Scheduling Two Agent Task Chains with a
Central Selection Mechanism, Journal of
Scheduling, 2015, 18(3), 243--261.
Selected conference papers |
[C1] Agnetis, A., Lucertini, M., Nicolò, F., 1989,
Just-in-time Scheduling in a Pipeline Manufacturing System, Proceedings of IFAC
workshop Decisional Structures in Automated Manufacturing, Torino,
Settembre 1989, Pergamon Press, 81--87.
[C2] Agnetis, A., Arbib, C., Stecke, K.E., 1990,
Optimal Two-machine Scheduling in a Flexible Flow System, Proceedings of the
2nd International Conference on CIM, Troy, NY, May 1990, IEEE Computer
society press, 47--54.
[C3] Agnetis, A., Lucertini, M., Nicolò, F., 1990, Flexibility/Cost
Tradeoff in the Design of Production Systems: a Preliminary Approach, Proceedings
of the IFIP Conference on Modelling the Innovation, Roma, Marzo 1990,
North-Holland, 247--257.
[C4] Agnetis, A., Arbib C., Lucertini M., Nicolò, F., 1990, Combinatorial
Models for Flow management in Flexible
Production Systems, Atti delle Giornate di lavoro AIRO, Sorrento, 3-5
ottobre 1990, 3--27.
[C5] Agnetis, A., Lucertini
M., Nicolò, F., 1991, Tool Handling Synchronization in Flexible Manufacturing
Cells, Proceedings of the 1991 IEEE Conference on Robotics and Automation,
Sacramento, CA, Aprile 1991, 1789--1794.
[C6] Agnetis, A., Oriolo, G., Pacciarelli, D., Rossi,
F., 1993, A Dynamic Lookahead Dispatching Rule in a Flexible Flow Line for
Automobile Assembly, Proceedings of the IFAC 1993 World Congress,
Sydney, Australia, July 1993, 493--496.